Skip to content

Planning permission

Planning permission is not normally needed when installing a biomass system in a house if the work is all internal. If the installation requires a flue outside, however, it will normally be permitted development if the conditions outlined below are met.

  • Flues on the rear or side elevation of the building are allowed to a maximum of one metre above the highest part of the roof.
  • If the building is listed or in a designated area even if you enjoy permitted development rights it is advisable to check with your local planning authority before a flue is fitted. Consent is also likely to be needed for internal alterations.
  • In a conservation area or in a World Heritage site the flue should not be fitted on the principal or side elevation if it would be visible from a highway.

If the project also requires an outside building to store fuel or related equipment the same rules apply to that building as for other extensions and garden outbuildings.

  • Read more about planning and extensions.
  • Read more about planning and outbuildings.

Find a Trade Professional

Use our partner directories from CIAT, FMB or RTPI to find an chartered architectural technologist, builder or planning consultant to help with your project or development.

Find a professional


Useful links

Make an application Studio Charrette planning consultancy calculator

      The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Ministry of Housing, Communities & Local Government (MHCLG). All content © 2024 Planning Portal.

      The Planning Portal is delivered by PortalPlanQuest Limited which is a joint venture between TerraQuest Solutions Limited and the Ministry of Housing, Communities & Local Government (MHCLG). All content © 2024 Planning Portal.